• xav@programming.dev
    link
    fedilink
    arrow-up
    1
    ·
    5 hours ago

    In France we have building codes and permits and inspection. But no permit needed for such a small operation, and you can use your electrical installation while you wait for the inspection (that may never come).

    There are 2 devices to install and wire inside the electrical board, how long should that take without cutting corners ?

    Also sorry for the choice of word but that’s what I think it is when doing something that goes against you’re best interest.